Tuesday, November 12, 2013

Safety Procedures in my major


 First, i´m studying computer engineering so the safety procedures in this work area would be:

 *You must have a secret code to save personal or confidencial information.

 *Do not download any doc. of a strange e-mail account.

 *You must always have an updated antivirus.

 *You have to have an emergency alarm in case of fire.

 *You should have cameras in your office.






Horror Story (pig story)




It was a cold Halloween in a little town, Tulio and his family were visiting his family there. They ate dinner and it started to rain, it was like 10:00 pm and Tulio went to the yard, he saw the face of a red eyed pig in the neighbor´s house.
He was too fraightened but he was with his favourite friend, his teddy bear, so he embraced it and calmed down. He entered the house with his parents and grandparents; everybody went to sleep and 2 hours after that, there was a loud noise in Tulio´s grandparents room, so he and his parents went there to see and when they opened the door, there was a big winged red eyed pig standing up eating his grandfather´s head, the dead body of his grandma was already without head; when they saw the pig´s eyes they were inmediatly paralyzed. While they were paralyzed the teddy bear went to that room, ¡he was alive!, but he was friend of the pig,before he(the pig) will kill them , he told them that he murdered humans eating their heads because 50 years ago a peasant cut off his son´s head in front of his eyes, then the peasant killed him. After telling his history he decided to kill Tulio first. He was crying and the teddy bear tried to stop the pig but he ......... just killed him too.




The end.


Thursday, November 7, 2013

Speaking exercise Interview P.84 7.1 exercise 4

programme                                                                    experienced user?



FastNotes email system                                                      Yes i have, i used that system to send messages
                                                                                          and to archivate some notes.

FileShare database                                                            I really don´t know what is it, but if it´s what i                                                                                                think it is i use it to share my information like in                                                                                              programs like dropbox.


Excel                                                                                Yes i have used it, to create graphs, to have a                                                                                                perfect order of some costs or any numbers.


Word                                                                               Yes i have used this, i operate it perfectly.

Powerpoint                                                                       Yes i use it as well, but i prefer other kind of                                                                                                  programme to do presentations.

Dimensions





The lenght of the house is 12 meters.
It´s 4 meters wide, the height of the house is 6 meters;
The thickness of the ceiling is 20 cm,
The window in the right side of the house is 50 cm high and 50 cm long.
The  windows in the front of the house are 60 cm high and 50 cm long.
The door is 2 meters high, 40 , 1 meter long and its thickness is 15 cm.

Minute

Date 8th October
Venue: ITESM CVA S303
Participants: Enya, Diego & Iván


point                                                   discussion                                                                   action

  1.  subject                 we decided that the main objetive was to collect                            Enya
                                 money for acapulco habitants. so we agreed to do                        11th oct
                                a party, we will advertise about the party in ITESM.
  2. fee                       we agreed the price for each ticket wil be $80.                              Enya
                                                                                                                                    11th oct
  3. location               we decided to do it in "shine" because it is a big place.                    Diego
                               we will reservate as soon as we can.                                              10th oct
  4. date and               we want to do it on Nov. 2nd. we think that is a good                   Diego
    duration                date because is halloween, we decided that the duration                10th oct
                                will be from 7:00pm to 4:00am
  5. music                    we decided to hire a DJ for the music and buy a lot of                   Iván
    and drinks                kind of drinks.                                                                           1st Nov.
  6. Guests                  every person in ITESM will be invited.                                         Enya

  


Agenda


        Meeting Agenda                           Student Consule, planning party
        Date 8th October                         Time 12:00 pm Location ITESM CVA S303
        Participants                                   Enya Jardon, Diego Nuñez
        Chair person                                 Iván Galicia

        Item

       *Conference theme
       *Presentation
       *Subjects
       *Location
       *Date and duration
       *Fee
       *Guests
       *Music and drinks

Tuesday, November 5, 2013

CV

Iván graduated from MAnchester University on 1996, he studied Business there, he began his career on 1993. He decided to do his masters in the Leeds university on 1996. One year later he did his graduate trainee in the NOstrum LTD from 1997 to 1999. In those years he learned so much, so he joined the ALT International in 1999, being Marketing assistant because of his efforts he was promoted on 2001 to marketing manager, after 3 years in this company he left it on 2004 and now he is working in the PEnta productions.


Bad news good news

Daer maury,

Please find below a report on progress here at the new monterrey's branch.

Well first i want to tell you that we made a good progress with the new accounts department,
This shop will be inaugurated on the next monday if we're done with all the schedule,  i have hired 4 accountants and three guys to attend people, tomorrow im going to interview two men for the assistant job. I hope to be done with the recruitment schedule in two days,by the way we are four days ahead of installation schedule. We need a computer engineer as soon as possible , i have written to Paulo , an old friend in university, maybe he could take the Job, and Well...in general, i think thingsmare going well. We can open this on schedule, maybe before... Jeje i will send you another progress report nexo week.

Best wishes,

Iván